Platoon 4 responded to a structure fire May 10th at 8 Peck St. Battalion 1 arrived on scene and reported a working fire on the first floor of a 2 story wood frame. One occupant was out of the building reporting that everyone was out. Engine 3 stretched a line to the fire, Squad A established water supply, Engine 2 stretched a line to the second floor to check for extension while Truck 1 forced entry and set up fans for ventilation. Two birds and a guinea pig were removed from the building.